Maintenance Due List (Report) 0.
Introduction The Maintenance Due List provides an overview of all fitted parts,
inspections, services and SB/AD's that are due at projected hours,
landings/cycles, or months. 1.
Requirements Transport Canada 2.
Execution The Maintenance Due List contains: §
Date
and time of the report, §
Aircraft
registration, §
Abbreviation
of the applicable clock, aircraft type or assembly part number, §
Serial
number of aircraft or assembly, §
ATA
chapter for which the Maintenance Due List is printed, §
Assembly
keyword and description, §
Actual
hours and landings/cycles of the applicable clock, §
Projected
hours and landings/cycles, period for which the Maintenance Due List is
projected, §
Number
of open discrepancies, §
Part
number of the due part, suffix service letter or # sign if the part is out of
stock, §
Serial
number applicable to the part (in case of ATA chapters 05, 98, and 99 then this
is the serial number of the airframe or assembly), §
Keyword,
§
Description, §
Reference, §
Location,
§
assy
last done time, assy last done landings/cycles, and assy last done date, §
assy
due time, assy due landings/cycles, or assy due date, §
A/C
due time, A/C due landings/cycles, and §
ATA
chapter. An * after the due time, due
landings/cycles, or due date indicates that the life limit of the part has been
reached. For the parts that are out of stock (marked with a # sign) automatically
a "Maintenance Reorder Schedule From Due List" report will be
printed. This report contains: §
Date
and time of the report, §
Aircraft
registration, §
Abbreviation
of the applicable clock, aircraft type or assembly part number, §
Serial
number of aircraft or assembly, §
ATA
chapter for which the Maintenance Due List is printed, §
Assembly
keyword and description, §
Actual
hours and landings/cycles of the applicable clock, §
Projected
hours and landings/cycles, §
Period
for which the Maintenance Due List is projected, §
Number
of open discrepancies, §
Part
to be ordered, §
Keyword,
§
Description,
§
Vendor
codes of the last three vendors, and §
The
quantity to order. The Maintenance Due List report can be generated: §
With
discrepancies, §
With
sign off's, §
For
all aircraft, §
With
work completion forms, and §
If JCN
transactions are created. The hours, landings, engine cycles, months, ATA chapter, APU hours, and
APU landings for the projection can be entered. 2.1
How to print the Maintenance Due List?
3.
Examples |